Maintenance Management
A maintenance solution integrated with the design process
A maintenance solution integrated with the design process
– Plant’s technical information is spread in different systems
– Users can’t find plant information and documents
– Important plant information stays in the project
– PM specifications is not delivered digitally in case of new project
– Maintenance system is too complicated for many users
– No support for navigating with 3D models in plant
– Mobile clients can’t handle offline mode
Get 100% control on
Master concept’s new maintenance module provides several new features to simplify your maintenance work. With checklists you can easily tick off work steps or fill in work order with scanned measurements. New calendar function makes it easier and precisely to schedule preventive maintenance activity. To simplify the planning of work orders, users can now assign work orders to one department or to an unspecific resource. Available resources get work orders in a pick list where they can easily choose freely.
Ultimate 19 also released a new function for reviewing completed work. For example, the group or project managers can review, leave comments and evaluate the work before it’s completed and approved. If work order needs be supplemented or redone, group managers can easily send it back to the performer by asset Master app or the desktop version.
Master explorer is a complete system for plant information. Based on the design process and the amount of functions for information handling over a plant’s entire life cycle, Master explorer may:
– Document a plant to the smallest detail and exploit existing industry standards
– Describe all relations among objects in one plant
– Integration and collaboration with 2D and 3D CAD applications
– Manage versions and revisions of documents and information
– Specify configurations in the plant
With Master concept Maintenance, 3D models becomes accessible for operation and maintenance departments. 3D viewer in Master concept allows you to navigate in the plant which creates new possibilities to find maintenance information. Users will get overview of PM and WO when the object is found and it will be easy to create new fault reports.
To be able to support an increased focus on maintenance, Master concept can be used as one central system to simplify cooperation between design, operation and maintenance.
With Preventive Maintenance Module in Master concept, the critical design and maintenance analys can be collected and then create complete PM layouts for each object during the design phase.
Fault report and work orders shall be easy to use for everyone and be supportive in daily work. We have focused on making facility information and documents be easily found and the safety to obtain the latest revisions. Work orders can be used both for planning and execution of work during the comissioning phase of plant projects and after go-live.
Become 100% mobile with
New asset Master app has a new look and new features and is available for all mobile operating systems. It works both online and offline independent on internet connection.
• Error report with review and approve / reject work orders.
(e.g.) the group or project managers can review, leave comments and evaluate the work before it’s completed and approved. If work order needs be supplemented or redone, group managers can easily send it back to the performer by asset Master app or the desktop version.
• Picklist
To simplify the planning of work orders, users can now assign work orders to one department or to an unspecific resource. Available resources get work orders in a picklist where they can easily choose freely.
There is no coverage for mobile equipment in many maintenance situations which creates problems especially for field maintenance technicians. Therefore, our work order app works both online and offline. Besides, its simplicity to use makes our mobile solution the perfect tool for large user groups.
Simplify the collaboration between design, operation and maintenance
By considering the plant’s or building’s maintainability by design and construction, equipment’s availability can be greatly increased. With the ability to create Preventive Maintenance plans during the project, you can more quickly reach the maximum reliability and increased availability as well as improved ROI through the whole life cycle.
Support for type objects’ PM-templates during design phase means to manage large amount of assets that should be prepared with preventive maintenance plans smoothly. The ability to convert thick maintenance manuals to a simple clear structure saves years of work after commissioning.
Work order can be used for fault reporting and resource planning throughout the whole commissioning phase and is also an important tool for warranty management of assets for subcontractors. The work order module can be used for all types of activity planning in projects or during ongoing work.
Maintenance organizations now can be a part of the whole project in early stege. Master concept Maintenance enables all project participants within design, construction and maintenance apartment to work in the same system. Everyone has access to the same technical asset information, BIM/CAD models and maintenance data during all phases in project.
With an integrated system for technical asset information and maintenance functions, users can always access to up-to-date information when troubleshooting and planning of projects and jobs. Error reports can be accessible to all and be used during all phases of the project and operation.
With complete interfaces for business and maintenance systems, you can freely choose solution. Either continuing working in Master concept Maintenance during operation or transferring data to an existing system. Digitised information delivery for building and maintenance reduces lead time for trouble-free production.